Challenge
The executing construction company asked Contec Fiber whether infill between the bored piles was possible with a fibre shotcrete solution in order to avoid costly reinforcement work.
Solution
The originally planned reinforcement mesh was able to be replaced by the concept proposed by Contec Fiber. The synthetic macrofibre Concrix ES used made the desired, economical solution possible for the contractor.
Shotcrete for infill
The cost-effective solution for rapid construction progress.
Vision becomes reality
Project details
Product
Concrix ES at a dosage of 6.0 kg per m³ of shotcrete was used for spraying the dissolved bored pile wall.
Application
Shotcrete with the Concrix ES synthetic macrofibre was used to infill the interstices of the excavation pit stabilisation.
Country
Principality of Liechtenstein
City
Vaduz
Year of execution
2019
Shotcrete area
900 m²