Tram, Budapest (HU)
Projects
Description
The foundation of a tram in Budapest has to withstand high and dynamic loads, strong winters, salt and hot summers. Therefore, a reinforcement which offers highest durability for a long lifetime was required.
Advantages of Concrix ES solution:
- Durability of Concrix and thus longer lifetime/less maintenance
- Lower cost for reinforcement (replacement of steel)
- Shorter construction time (no installation time for steel)
- Less logistic costs (replacement of steel)
- Free of charge state-of-the-art static calculation (Eurocode 2)
Application Infrastructur slab track system
Object Tramline Budapest
Size 2 000 m
Country Hungary
Year 2015
Fibre Concrix ES – 4,0 kg/m³


