Besiktas Stadium, Istanbul (TR)

Projects

Description

A completely new stadium is built in Istanbul. But the progress of construction work was behind time schedule. A solution to save time and cost  has been highly appreciated.

Advantages of Fibrofor High Grade Solution:

  • Massive time savings (construction time)
  • Lower cost for reinforcement (replacement of steel)
  • Reduced labour cost (no/less installation time for steel)
  • All kind of surface treatment possible (also coating)
  • Improved shrinkage characteristics of concrete

Application Inside flooring
Customer Besiktas
Object Besiktas Stadium
Size 90 000 m²
Country Turkey
Year 2014/15
Fibre Fibrofor High Grade