Besiktas Stadium, Istanbul (TR)
Projects
Description
A completely new stadium is built in Istanbul. But the progress of construction work was behind time schedule. A solution to save time and cost has been highly appreciated.
Advantages of Fibrofor High Grade Solution:
- Massive time savings (construction time)
- Lower cost for reinforcement (replacement of steel)
- Reduced labour cost (no/less installation time for steel)
- All kind of surface treatment possible (also coating)
- Improved shrinkage characteristics of concrete
Application Inside flooring
Customer Besiktas
Object Besiktas Stadium
Size 90 000 m²
Country Turkey
Year 2014/15
Fibre Fibrofor High Grade