Distribution Centre – Austrian Post AG, Waidhofen/Ybbs (AT)

Projects

Description

New construction of the distribution center of Österreichische Post AG. This is a classic industrial floor with a thickness of 200 mm and cut joints at intervals of 10 x 10 m and a completely smooth surface.
The outer delivery zone for trucks consists of a 250 mm thick slab and 6 x 6 m fields. The client required a risk-free solution with synthetic fibers in compliance with current European standards. Executed by Pagitsch GesmbH, our qualified and experienced partner in Austria.

Advantages of Fibrofor High Grade solution:

  • Cost reduction (shorter construction time, less installation of steel mesh)
  • Reduction of early shrinkage cracks in the concrete and increase in wear resistance
  • Tailor-made report based on the applicable standards
  • No visible fibers on the surface
  • All types of surface treatment possible (including broom finish)

Application Inside flooring / external slab
Object Distribution center
Size 2 000 m2 / 400 m2
Country
Austria
Year 2022
Fibre Fibrofor High Grade