Tram, Budapest (HU)

Projects

Description

The foundation of a tram in Budapest  has to withstand high and dynamic loads, strong winters, salt  and hot summers. Therefore, a reinforcement which offers highest durability for a long lifetime was required.

Advantages of Concrix ES solution:

  • Durability of Concrix and thus longer lifetime/less maintenance
  • Lower cost for reinforcement (replacement of steel)
  • Shorter construction time (no installation time for steel)
  • Less logistic costs (replacement of steel)
  • Free of charge state-of-the-art static calculation (Eurocode 2)

Application Infrastructur slab track system 
Object
Tramline Budapest
Size 2 000 m
Country Hungary
Year 2015
Fibre Concrix ES – 4,0 kg/m³