Precast Traffic Block Element For Railway Tunnel – Israel (ISR)
Projects
Description
These elements between the rails allows rescue vehicles driving into the railway tunnel in case of an emergency.
Advantages of Concrix ES Solution:
- Durability of Concrix and thus longer lifetime/less maintenance
- Lower cost for reinforcement (totally replacement of steel)
- Rapid production of the elements, no installation time for steel
- Protection of the edges during transportation, because of 3-dimensionla reinforcement
- Free of charge state-of-the-art static calculation (Eurocode 2)
Application Infrastructure rail sub foundation
Object Railway tunnel
Size 1,29 x 1,22 x 0,20 m
Country Israel
Year 2016/17
Fibre Concrix ES, 4,0 kg/m³


