Our customer requested an economic and low-risk solution, including a design verification for a 1,800 m² industrial slab. The building’s owner is a solution provider for electronics in the southern part of Germany. The conditions set by our customer were for the slab to be crack-free and to bear forklift loads totalling 62 kN and rack loads with 34 kN per post (back to back). The slab also needed to bear truck loads with weights of 30 tons. Contec Fiber created a solution based on our synthetic fibre Fibrofor High Grade with a slab thickness of 200 mm and saw cut joint distances of 7.70 x 8.16 m. An integrated concrete core activation as well as insulation underneath the slab were also easily feasible.
Thanks to our partner @Fabrino in Germany for supporting this project.
Advantages of Fibrofor High Grade Solution:
- Less steel – cost reduction (material and labour)
- No corrosion – longer service life
- Less CO₂ – environmentally friendlier (EPD certified)
- No visible fibres on the surface
- Massive reduction of early shrinkage cracks
Application Industrial flooring
Object Production hall
Size 1 800 m²
Country Germany
Year 2023