HAGNECK power station, Switzerland

HAGNECK power station, Switzerland Projects Description The efficiency of the water power plant shall be increased plus the environment shall be up-graded ecologically with various measures. Advantages of Fibrofor High Grade solution: Improved abrasion protection Lower costs for reinforcement (replacement or reduction of reinforcing steel) Faster construction progress thanks to elimination of laying work Improved…