Road construction – Bus lane Maastricht (NL)

Road construction – Bus lane Maastricht (NL) Projects Description New construction of a bus lane for international buses in Maastricht. Hoogmartens B.V. as responsible subcontractor of STRABAG B.V. used Fibrofor Green (natural fibre product) for better shrinkage behaviour and less early shrinkage cracks in the concrete road construction. Advantages of Green fibre solution: Only 0,6…

Platform renovation – railway station Zutphen (NL)

Platform renovation – railway station Zutphen (NL) Projects Description The renovation works of the train platform for railway station Zutphen was made with black coloured C 30/37 XF4 concrete with thickness from 30 to 70 mm. For better shrinkage behaviour and less early shrinkage cracks the Fibrofor Green (natural fibre product) was used. The distance…