External Hardstanding – Zirec Brick Recycling Center, Burgdorf (CH)

External Hardstanding –  Zirec Brick Recycling Center, Burgdorf (CH) Projects Description The newly constructed outdoor area for Zirec connects two levels on the factory premises. To enable the connection of the two levels, a ramp was created which shortens the distances and optimizes the workflow. In this project a recycled concrete was used, which meets…

Pavement – Loading Yard (IE)

Pavement – Loading Yard (IE) Projects Description Construction of a new outside paving area for the loading yard. Crack reduced design and highly frequented truck traffic loads have specified the general conditions. Joint distance of 5.00 x 5.00 m and slab thickness of 150 mm. In addition, the customer wanted a risk-free solution consisting of…

Logistic area Westfields, Oirschot (NL)

Logistic area Westfields, Oirschot (NL) Projects Description Construction of a new outside paving area in front of the distribution center «Westfields» for the «DPD Nederland» logistic company. Crack reduced design and highly frequented truck traffic loads have specified the general conditions. The joint distance of 8.00 x 4.62 m was adapted perfectly for a concrete…

American Football Field– Universidad Autónoma de Nuevo León, Monterrey (MX)

American Football Field– Universidad Autónoma de Nuevo León, Monterrey (MX) Projects Description The University decided to use a modern and economical reinforcement system for this new sports field in their campus area. The execution of the foundation slab had to be carried out at nighttime because of the high temperature during the day in summertime…

Airport Franjo Tuđman, sidewalk area, Zagreb (HR)

Airport Franjo Tuđman, sidewalk area, Zagreb (HR) Projects Description Restructuring forecourt area of the International Airport of Zagreb. The challenge was to find an economical and technical solution which can fulfill the high demands of architectural design. Advantages of Fibrofor High Grade solution: Massive time savings (construction time) Lower cost for reinforcement (replacement of steel)…

Recycling Centre RD4 Heeren (NL) 4

Recycling Centre RD4 Heeren (NL) Projects Description RD4, a recyclable processor in the Netherlands, recently expanded its Heerlen branch’s external area. The expansion featured an impressive 9000 m² of fibre reinforced concrete, skilfully built by Roos Groep. The concrete slab measures 210 mm in thickness, with doweled cut joints placed at 5 x 5 meters…

Brewery Freustadt Distribution Center (AT)

Brewery Freustadt Distribution Center (AT) Projects Description Our customer requested an economic and low-risk solution, including a design verification for a 4000 m² industrial slab & 3000 m² pavement for the delivery area. This new distribution centre for the Freistädter Brewery was built in Freistadt/AT. The requirements set by our customers were for the slab…