Foundation plate for TBM – Bözberg tunnel (CH)
Foundation plate for TBM – Bözberg tunnel (CH) Projects Description The new SBB Bözberg tunnel (≈ 2500 m length) has to be drilled by the TBM «S1012 Bözberg». To reach the starting position the TBM needs a foundation plate to move forward with its walking legs. The construction company decided to switch to the synthetic…









