Hydro Power Plant Station «Berschnerbach», Berschis (CH)

Hydro Power Plant Station «Berschnerbach», Berschis (CH) Projects Description The tunnel for the pressure water pipe of the hydro power plant station «Berschnerbach» (≈ 1300 m length) with a gradient from 20% (pipe gallery) up to 142% for the inclined shaft. The permanent inner lining sprayed concrete is only reinforced with the synthetic high-performance fibre…

Various precast elements, from simple pure fibre designs, to more complex hybrid solutions…

Various precast elements, from simple pure fibre designs, to more complex hybrid solutions… Projects Advantages of Concrix ES Solution: Massive reduction of steel reinforcement assembly Significant reduction of CO₂ emissions No corrosion Longer durability 3-dimensional reinforcement reaching all edges Customised structural dimensioning

Erkundungsstollen des Stadttunnels Feldkirch (AT)

Erkundungsstollen des Stadttunnels Feldkirch (AT) Projekte Beschreibung Der Bau des 1212 m langen Erkundungsstollen Tisis, als Teil des Projekts Stadttunnels Feldkirch (Österreich), wurde seitens der Allianz EKS Tisis (Jägerbau, Strabag, Land Vorarlberg) initiiert. Für die Sicherungsfunktion nach dem Abschlag und gleichzeitig als Teil der permanenten Innenschale wird der Makrofaser verstärkte Spritzbeton mit ca. 10 bis…

SiSto Carpteig Tunnel, Thusis (CH)

SiSto Carpteig Tunnel, Thusis (CH) Projekte Beschreibung Der Bau des 2036 m langen Verkehrssicherheitstunnels Crapteig begann 2018 und endete 2022. Der Einsatz von synthetisch faserverstärktem Spritzbeton für den Erstschutz und für die gespritzte dauerhafte Innenauskleidung ermöglichte einen Baufortschritt von 24m/Woche im Vergleich zum ursprünglich stahlbewehrten Beton (Mesh-) Lösung mit 16 m/Woche. Eine Steigerung von 50…