Hydro Power Plant Station «Berschnerbach», Berschis (CH)

Hydro Power Plant Station «Berschnerbach», Berschis (CH) Projects Description The tunnel for the pressure water pipe of the hydro power plant station «Berschnerbach» (≈ 1300 m length) with a gradient from 20% (pipe gallery) up to 142% for the inclined shaft. The permanent inner lining sprayed concrete is only reinforced with the synthetic high-performance fibre…

Various precast elements, from simple pure fibre designs, to more complex hybrid solutions…

Various precast elements, from simple pure fibre designs, to more complex hybrid solutions… Projects Advantages of Concrix ES Solution: Massive reduction of steel reinforcement assembly Significant reduction of CO₂ emissions No corrosion Longer durability 3-dimensional reinforcement reaching all edges Customised structural dimensioning