Hydro Power Plant Station «Berschnerbach», Berschis (CH)

Hydro Power Plant Station «Berschnerbach», Berschis (CH) Projects Description The tunnel for the pressure water pipe of the hydro power plant station «Berschnerbach» (≈ 1300 m length) with a gradient from 20% (pipe gallery) up to 142% for the inclined shaft. The permanent inner lining sprayed concrete is only reinforced with the synthetic high-performance fibre…

Excavation, shotcrete infill – Biology Centre University Vienna (AT)

Excavation, shotcrete infill – Biology Centre University Vienna (AT) Projects Description The excavation stabilisation made with discontinuous bored pile walls with shotcrete infilling for the new Biology Centre for the University of Vienna. The originally planned reinforcement for infilling was AQ 65 steel mesh (332 mm²/m), which was totally replaced by using macro fiber reinforced…

Various precast elements, from simple pure fibre designs, to more complex hybrid solutions…

Various precast elements, from simple pure fibre designs, to more complex hybrid solutions… Projects Advantages of Concrix ES Solution: Massive reduction of steel reinforcement assembly Significant reduction of CO₂ emissions No corrosion Longer durability 3-dimensional reinforcement reaching all edges Customised structural dimensioning

Waste water intake structure (NL)

Waste water intake structure (NL) Projects Description This prefabricated concrete element is made with C 50/60 concrete and reinforced with 4,0 kg/m³ macro synthetic fibres. The use of the  fibres is mainly to avoid damages, especially at the edges, during transport and handling of the elements. Advantages of Concrix ES Solution: Lower cost for reinforcement…