Outdoor area DC Westfields, Oirschot/NL

Outdoor area DC Westfields, Oirschot/NL Projects The challenge The new outdoor area in front of the “Westfields” distribution center of the logistics company “DPD Nederland” required an economical and durable solution. Crack-free requirements and heavily frequented truck traffic loads have the general requirements. Conditions defined.   Solution The solution developed provided for a joint spacing…

Infill of bored pile wall Liechtensteiner Rotkreuz/FL

Infill of bored pile wall Liechtensteiner Rotkreuz/FL Projects Description The excavation pit shoring by means of a broken up bored pile wall and shotcrete infill for the new building of the Liechtenstein Red Cross and the Vaduz building administration. The originally planned reinforcement for the infill was a B257 steel mesh (2.57 cm²/m) on the…

Puskás Ferenc National Stadium, Budapest/HU

Puskás Ferenc National Stadium, Budapest/HU Projects Description For the construction of the stadium, which can hold up to 68,000 spectators, prefabricated concrete parts were used for the construction of the grandstand. These elements are reinforced with pre-stressed steel and Concrix ES macrofibres. Advantages of Concrix ES solution: Durability of Concrix and thus longer lifetime/less maintenance…