Hydro Power Plant Station «Berschnerbach», Berschis (CH)

Hydro Power Plant Station «Berschnerbach», Berschis (CH) Projects Description The tunnel for the pressure water pipe of the hydro power plant station «Berschnerbach» (≈ 1300 m length) with a gradient from 20% (pipe gallery) up to 142% for the inclined shaft. The permanent inner lining sprayed concrete is only reinforced with the synthetic high-performance fibre…

Excavation, shotcrete infill – Biology Centre University Vienna (AT)

Excavation, shotcrete infill – Biology Centre University Vienna (AT) Projects Description The excavation stabilisation made with discontinuous bored pile walls with shotcrete infilling for the new Biology Centre for the University of Vienna. The originally planned reinforcement for infilling was AQ 65 steel mesh (332 mm²/m), which was totally replaced by using macro fiber reinforced…

Exploration Tunnel Feldkirch City Tunnel (AT)

Exploration Tunnel Feldkirch City Tunnel (AT) Projects Description The construction of the 1212-meter-long exploration tunnel Tisis, as part of the Feldkirch City Tunnel project in Austria, was initiated by the Allianz EKS Tisis Jägerbau, Strabag, State of Vorarlberg. To fulfil its safety function after excavation and also as part of the permanent inner shell, macro-fibre…

SiSto Carpeting Tunnel (CH)

SiSto Carpeting Tunnel (CH) Projects Description The construction of the 2036 m long road safety tunnel Crapteig started 2018 and finished 2022. The use of synthetic fibre reinforced sprayed concrete for the initial protection and for the sprayed permanent inner lining allowed a progress of 24 m/week compared to the originally steel reinforced (mesh) solution…