Bottling plant, Allied Blenders & Distillers, Mahbubnagar, Telangana (IN)

Bottling plant, Allied Blenders & Distillers, Mahbubnagar, Telangana (IN) Projects Description Newly built bottling plant for Allied Blenders & Distillers. In cooperation with the engineering office M.R. WARERKAR & ASSOCIATES PVT. LTD. we designed the fibre reinforced industrial slab.  The requirement of the customer was a risk-free solution consisting of a high quality fibre in…

American Football Field– Universidad Autónoma de Nuevo León, Monterrey (MX)

American Football Field– Universidad Autónoma de Nuevo León, Monterrey (MX) Projects Description The University decided to use a modern and economical reinforcement system for this new sports field in their campus area. The execution of the foundation slab had to be carried out at nighttime because of the high temperature during the day in summertime…

Airport Franjo Tuđman, sidewalk area, Zagreb (HR)

Airport Franjo Tuđman, sidewalk area, Zagreb (HR) Projects Description Restructuring forecourt area of the International Airport of Zagreb. The challenge was to find an economical and technical solution which can fulfill the high demands of architectural design. Advantages of Fibrofor High Grade solution: Massive time savings (construction time) Lower cost for reinforcement (replacement of steel)…

Production hall Sudhakar Pipes, Medchal (IN)

Production hall Sudhakar Pipes, Medchal (IN) Projects Description Newly built production hall for PVC pipe production. The special challenge was the in India typical vacuum dewatering flooring method. In addition, the customer wanted a risk-free solution consisting of a high-quality fibre in combination with a static calculation based on international standards. Advantages of Fibrofor High…

Warehouse for foodstuffs, Sered (SK)

Warehouse for foodstuffs, Sered (SK) Projects Description Large capacity warehouse for raw materials for the production of pastry products. In stock is an advanced electronically controlled rack system to provide logistics and material handling with unattended forklifts. The load on the shelves is 8.9 tons, the floor thickness 22 cm on the ground substrate compacted…

Distribution centre Austrian Post AG, Waidhofen/Ybbs (AT)

Distribution Centre – Austrian Post AG, Waidhofen/Ybbs (AT) Projects Description New construction of the distribution center of Österreichische Post AG. This is a classic industrial floor with a thickness of 200 mm and cut joints at intervals of 10 x 10 m and a completely smooth surface. The outer delivery zone for trucks consists of…

Eurobus Terminal, Bassersdorf (CH)

Eurobus Terminal, Bassersdorf (CH) Projects Description A new bus terminal for urban buses and travel coaches. Including  maintenance and washing area. Advantages of Fibrofor High Grade solution: Massive time savings (construction time) Lower cost for reinforcement (replacement of steel) Reduced labour cost (no/less installation time for steel) All kind of surface treatment possible (also coating)…