Besiktas Stadium, Istanbul (TR)

Besiktas Stadium, Istanbul (TR) Projects Description A completely new stadium is built in Istanbul. But the progress of construction work was behind time schedule. A solution to save time and cost  has been highly appreciated. Advantages of Fibrofor High Grade Solution: Massive time savings (construction time) Lower cost for reinforcement (replacement of steel) Reduced labour…

Moya Sunny Garden, Slazany (SK)

Moya Sunny Garden, Slazany (SK) Projects Description A huge Greenhouse with a size of more than 6 000 m², containing modern technology for growing fresh vegetables. The building includes the farming area as well as all necessary technical facilities. Advantages of Fibrofor High Grade Solution: Massive time savings (construction time) Reduced labour cost (no/less installation…

Roundabout Stein AG (CH)

Roundabout Stein AG (CH) Projects Description Roundabouts, but also other traffic areas that are constructed with asphalt, often suffer deformations over time from heavy trucks and buses, especially during the warm season. Surface: broom stroke   Advantages of Concrix ES Solution: Less or no deformations thanks to the use of concrete Short construction time (no…

Precast Traffic Block Element For Railway Tunnel – Israel (ISR)

Precast Traffic Block Element For Railway Tunnel – Israel (ISR) Projects Description These elements between the rails allows rescue vehicles driving into the railway tunnel in case of an emergency.   Advantages of Concrix ES Solution: Durability of Concrix and thus longer lifetime/less maintenance Lower cost for reinforcement (totally replacement of steel) Rapid production of…