HAGNECK power station, Switzerland

HAGNECK power station, Switzerland Projects Description The efficiency of the water power plant shall be increased plus the environment shall be up-graded ecologically with various measures. Advantages of Fibrofor High Grade solution: Improved abrasion protection Lower costs for reinforcement (replacement or reduction of reinforcing steel) Faster construction progress thanks to elimination of laying work Improved…

Roundabout, Pratteln Canton Basel-Landschaft (CH)

Roundabout, Pratteln Canton Basel-Landschaft (CH) Projects Advantages of Fibrofor Diamond solution: Reduction of costs (shorter construction time, reduced installation effort, etc.) No corrosion and therefore lower future maintenance costs No deformations (lanes) and increased service life thanks to the concrete design Tailor-made structural analysis based on the current standards Reduction of the CO₂ footprint through…

Tram, Budapest (HU)

Tram, Budapest (HU) Projects Description The foundation of a tram in Budapest  has to withstand high and dynamic loads, strong winters, salt  and hot summers. Therefore, a reinforcement which offers highest durability for a long lifetime was required. Advantages of Concrix ES solution: Durability of Concrix and thus longer lifetime/less maintenance Lower cost for reinforcement…

Production hall Sudhakar Pipes, Medchal (IN)

Production hall Sudhakar Pipes, Medchal (IN) Projects Description Newly built production hall for PVC pipe production. The special challenge was the in India typical vacuum dewatering flooring method. In addition, the customer wanted a risk-free solution consisting of a high-quality fibre in combination with a static calculation based on international standards. Advantages of Fibrofor High…

Warehouse for foodstuffs, Sered (SK)

Warehouse for foodstuffs, Sered (SK) Projects Description Large capacity warehouse for raw materials for the production of pastry products. In stock is an advanced electronically controlled rack system to provide logistics and material handling with unattended forklifts. The load on the shelves is 8.9 tons, the floor thickness 22 cm on the ground substrate compacted…

Distribution centre Austrian Post AG, Waidhofen/Ybbs (AT)

Distribution Centre – Austrian Post AG, Waidhofen/Ybbs (AT) Projects Description New construction of the distribution center of Österreichische Post AG. This is a classic industrial floor with a thickness of 200 mm and cut joints at intervals of 10 x 10 m and a completely smooth surface. The outer delivery zone for trucks consists of…

Eurobus Terminal, Bassersdorf (CH)

Eurobus Terminal, Bassersdorf (CH) Projects Description A new bus terminal for urban buses and travel coaches. Including  maintenance and washing area. Advantages of Fibrofor High Grade solution: Massive time savings (construction time) Lower cost for reinforcement (replacement of steel) Reduced labour cost (no/less installation time for steel) All kind of surface treatment possible (also coating)…

CB-tec production and storage hall, Ungerhausen (DE)

CB-tec production and storage hall, Ungerhausen (DE) Projects Description Newly built production and storage hall for sawing natural stones. The special challenge was a joint-less slab construction with field sizes of 35 x 33 m with integrated drain channels. In addition, the customer wanted a risk-free solution consisting of a high-quality fibre in combination with…

Production and storage hall Alois Müller, Ungerhausen (DE)

Production and storage hall Alois Müller, Ungerhausen (DE) Projects Description New construction of the production hall and warehouse for Alois Müller GmbH. It is a classic, jointless industrial floor with field sizes of 26 x 26 m with integrated drainage channels and XPS insulation between the compacted subsoil and the industrial floor. The customer asked…

Logistic Centre Westfields, Oirschot (NL)

Outdoor area DC Westfields, Oirschot/NL Projects Herausforderung Der neue Aussenbereich vor dem Distributionszentrum «Westfields» des Logistikunternehmens «DPD Nederland» erforderte eine wirtschaftliche und dauerhafte Lösung. Rissfreie Anforderung sowie stark frequentierte LKW-Verkehrslasten haben die allg. Bedingungen festgelegt.   Lösung Die ausgearbeitete Lösung sah einen Fugenabstand von 8,00 x 4,62 m vor, welcher perfekt für den Betoneinbau mittels…