Excavation, shotcrete infill – Biology Centre University Vienna (AT)

Excavation, shotcrete infill – Biology Centre University Vienna (AT) Projects Description The excavation stabilisation made with discontinuous bored pile walls with shotcrete infilling for the new Biology Centre for the University of Vienna. The originally planned reinforcement for infilling was AQ 65 steel mesh (332 mm²/m), which was totally replaced by using macro fiber reinforced…

Various precast elements, from simple pure fibre designs, to more complex hybrid solutions…

Various precast elements, from simple pure fibre designs, to more complex hybrid solutions… Projects Advantages of Concrix ES Solution: Massive reduction of steel reinforcement assembly Significant reduction of CO₂ emissions No corrosion Longer durability 3-dimensional reinforcement reaching all edges Customised structural dimensioning

Waste water intake structure (NL)

Waste water intake structure (NL) Projects Description This prefabricated concrete element is made with C 50/60 concrete and reinforced with 4,0 kg/m³ macro synthetic fibres. The use of the  fibres is mainly to avoid damages, especially at the edges, during transport and handling of the elements. Advantages of Concrix ES Solution: Lower cost for reinforcement…

Besiktas Stadium, Istanbul (TR)

Besiktas Stadium, Istanbul (TR) Projects Description A completely new stadium is built in Istanbul. But the progress of construction work was behind time schedule. A solution to save time and cost  has been highly appreciated. Advantages of Fibrofor High Grade Solution: Massive time savings (construction time) Lower cost for reinforcement (replacement of steel) Reduced labour…

Moya Sunny Garden, Slazany (SK)

Moya Sunny Garden, Slazany (SK) Projects Description A huge Greenhouse with a size of more than 6 000 m², containing modern technology for growing fresh vegetables. The building includes the farming area as well as all necessary technical facilities. Advantages of Fibrofor High Grade Solution: Massive time savings (construction time) Reduced labour cost (no/less installation…