Challenge
For the new production and storage hall of Wacker-Neuson in Hörsching, the planner was looking for an efficient and economical solution for the industrial floor. The floor had to meet high demands in terms of evenness and robustness and offer low maintenance requirements.
Solution
Contec Fiber developed a customised solution that met all the requirements. To cover the planned loads, a solution with Fibrofor High Grade was worked out in lieu of the originally planned 25 kg of steel fibres per m³ of concrete. While the industrial floor was being poured, the new concrete exterior surface was also implemented according to a proposal by Contec Fiber. The corrosion-free surface and the increased abrasion resistance were important criteria for the customer.
Robust industrial floor
Efficient, economical and with low maintenance requirements.

Vision becomes reality
Project description
Product
For the interior, Fibrofor High Grade at a dosage of 1 kg per m³ of concrete was used.
Application
Fibrofor High Grade has been used in the production and storage areas. The thickness of the slabs poured was 250 mm.
Country
Austria
City
Hörsching
Year of execution
2011
Floor area
50,000 m²; kerf interval 8.70 m x 8.70 m
Subsoil conditions
The load-bearing subsoil had an EV2 value of ≥100 MPa.