Challenge

In addition to efficient production in the precast plant, there was a desire to have a permanent reinforcement solution for the Austrian Federal Railways (ÖBB).

Solution

Contec Fiber developed a fibre hybrid solution for the manufacturer of the elements, enabling an economical and ecological solution for the client. Reducing the steel reinforcement made it possible to speed up the production and delivery of the components.

Cable pull shaft precast part

Economical and ecological fiber hybrid solution.

Vision becomes reality

Project details

  • Product

    To cover the stresses that occur, the static calculation resulted in a dosage of 4.5 kg Concrix ES per m³ plus additional steel reinforcement.

  • Application

    The solution with 4.5 kg of Concrix ES per m³ of concrete allowed 640 kg of construction steel to be saved per shaft element. This corresponds to a reduction of around 65% of the original structural steel content and CO₂ savings of 1,365 kg per shaft element.

  • Country

    Austria

  • Year of execution

    2020

Other projects

Exterior Surface of DC Westfields, Oirschot/NL

For their logistics centre, DC Westfields relied on corrosion-free and robust concrete surfaces reinforced with Fibrofor Diamond.

See more

Infill, bored pile wall, Liechtenstein Rotkreuz/FL

The shotcrete reinforced with Concrix ES for infilling the dissolved bored pile wall provided protection to the workers. Spraying from a safe distance eliminated the need to install conventional reinforcement mesh in the non-secured area between the bored piles.

See more

Lego industrial flooring, Nyíregyháza / HU

For LEGO’s new production halls in Nyíregyháza (HU), the building owner relied on the proven synthetic fibre Fibrofor High Grade for over 120,000 m² of flooring.

See more

Industrial floor at Wacker Neuson, Hörsching / AT

At construction machinery manufacturer Wacker-Neuson in Hörsching (AT), the high quality requirements for the floor were met thanks to the use of Fibrofor High Grade.

See more

Puskás Ferenc National Stadium, Budapest/HU

At Puskás Ferenc National Stadium, the bicomponent m⁠a⁠c⁠r⁠of⁠i⁠b⁠r⁠e Concrix ES – combined with prestressed wires – was chosen as an ideal and durable construction method for the precast grandstand elements.

See more
See all

Questions? Feel free to contact us.

We will only use the data you provide to contact you and will keep it until the purpose has been fulfilled. Further information on data protection and contact options can be found at the bottom of each page.

Send

Please enter an e-mail address to download the file.

Your e-mail address will only be used for sending the file and will not be saved.

Request