ÖBB cable pull shaft precast part

Challenge

In addition to efficient production in the precast plant, there was a desire to have a permanent reinforcement solution for the Austrian Federal Railways (ÖBB).

Solution

Contec Fiber developed a fibre hybrid solution for the manufacturer of the elements, enabling an economical and ecological solution for the client. Reducing the steel reinforcement made it possible to speed up the production and delivery of the components.

Cable pull shaft precast part

Economical and ecological fiber hybrid solution.

Vision becomes reality

Project details

  • Product

    To cover the stresses that occur, the static calculation resulted in a dosage of 4.5 kg Concrix ES per m³ plus additional steel reinforcement.

  • Application

    The solution with 4.5 kg of Concrix ES per m³ of concrete allowed 640 kg of construction steel to be saved per shaft element. This corresponds to a reduction of around 65% of the original structural steel content and CO₂ savings of 1,365 kg per shaft element.

  • Country

    Austria

  • Year of execution

    2020

Other projects

Exterior Surface of DC Westfields, Oirschot/NL

See more

Infill, bored pile wall, Liechtenstein Rotkreuz/FL

See more

Lego industrial flooring, Nyíregyháza / HU

See more

Industrial floor at Wacker Neuson, Hörsching / AT

See more

Puskás Ferenc National Stadium, Budapest/HU

See more
See all

Questions? Feel free to contact us.

We will only use the data you provide to contact you and will keep it until the purpose has been fulfilled. Further information on data protection and contact options can be found at the bottom of each page.

Send

Please enter an e-mail address to download the file.

Your e-mail address will only be used for sending the file and will not be saved.

Request