Exploration Tunnel Feldkirch City Tunnel (AT)

Exploration Tunnel Feldkirch City Tunnel (AT) Projects Description The construction of the 1212-meter-long exploration tunnel Tisis, as part of the Feldkirch City Tunnel project in Austria, was initiated by the Allianz EKS Tisis Jägerbau, Strabag, State of Vorarlberg. To fulfil its safety function after excavation and also as part of the permanent inner shell, macro-fibre…

Ready-mix station Hoogyeen (NL)

Ready-mix station Hoogyeen (NL) Projects Description Pavements are a typical application for synthetic fibre reinforced concrete applications. The use of macro-synthetic fibre-reinforced concrete is proving to be the best measure for saving costs, time and CO₂ and at the same time not having to accept any qualitative or technical disadvantages. Our powerful macrofibre Concrix ES…

Tram, Budapest (HU)

Tram, Budapest (HU) Projects Description The foundation of a tram in Budapest  has to withstand high and dynamic loads, strong winters, salt  and hot summers. Therefore, a reinforcement which offers highest durability for a long lifetime was required. Advantages of Concrix ES solution: Durability of Concrix and thus longer lifetime/less maintenance Lower cost for reinforcement…

Habau prefabricated facade element (AUT)

Habau prefabricated facade element (AUT) Projects Description Design element for a facade, made of white concrete. Advantages of Green fibre solution: Cost saving due to reduction of steel reinforcement Reduction of labour cost (no time-consuming installation of steel mesh) No danger of corrosion and thus rust spots on the surface Free of charge state-of-the-art static…

Prefabricated balcony slab element – Retrofittable balconies for flats – Dornbirn (AT)

Prefabricated balcony slab element – Retrofittable balconies for flats – Dornbirn (AT) Projects Description This prefabricated concrete slab element with only 50 mm element thickness is made with C 50/60 concrete and reinforced with 6,0 kg/m³ bi-component macro synthetic fibres together with 600 gram/m³ natural fibres Green. This fibre hybrid solution works perfectly for such…

Prefabricated part for cable duct ÖBB

Prefabricated part for cable duct ÖBB Projects Effective steel reinforcement reduction 640 kg steel replaced by 4,50 kg/m3 Concrix ES fibre dosage. 65 % less steel compared to original solution. Advantages of Concrix ES solution: Massive reduction of steel reinforcement assembly Significant reduction of CO₂ emissions No corrosion Longer durability 3-dimensional reinforcement reaching all edges…

Puskás Ferenc National Stadium, Budapest/HU

Puskás Ferenc National Stadium, Budapest/HU Projects Description For the construction of the stadium, which can hold up to 68,000 spectators, prefabricated concrete parts were used for the construction of the grandstand. These elements are reinforced with pre-stressed steel and Concrix ES macrofibres. Advantages of Concrix ES solution: Durability of Concrix and thus longer lifetime/less maintenance…